- info@henseysports.com
- 978-267-5047
Available By Appointment Tuesday Through Saturday
G-FKB1WN7NGB
Remove the old grip and tape, then Install a grip.
Old cracked grips and tape require more removal time.
Remove and save an installed grip
More than 3 wraps of tape for re-gripping.
Measure, bend to specified loft and lie, and remeasure to assure accuracy.
Complete club Total weight, balance point, swingweight, and MOI
Build to length [standard progression or True Length Technology], lie, loft, swingweight, MOI match, shaft flat line oscillation [FLO] and grip size.
Build to length [standard progression or True Length Technology] lie, loft, Heft [swingweight, MOI, weight, balance point], frequency match shafts, shaft profiling, and grip size.
Measure and record the weight, frequency,balance point, flow, and spine.
Service includes removal, cleaning, prep, trim, install and cut to length
Service includes removal, cleaning, prep, trim, install and cut to length for Bore Thru heads
New components only
Install weights or vibration dampening inserts.
Remove shaft, clean shaft, and clean hosel.
Remove shaft, clean shaft, and clean hosel.
Tip trim and prep for installation.
Change club length. Does not include the cost of the extension insert.
Measure and make external changes to adjust swingweight of golf club
Measure and make external changes to adjust dynamic heft of golf club
GET IN TOUCH
Copyright © 2024 Hensey Sports – All Rights Reserved.